资讯
During its mission to Japan from December 9 to 12, 2024, the Task Force assessed the technical and regulatory aspects of the ALPS-treated water discharge. This included an on-site visit to the FDNPS ...
The water has been kept in more than 1,000 tanks after being treated with multi-nuclide removal equipment, known as ALPS. TEPCO built extra tanks in December to hold up to 1.37 million tons at the ...
The disposal of Fukushima’s contaminated water poses profound and potentially catastrophic risks to the environment and ...
In 2011, the Fukushima-Daiichi plant on Japan’s northeastern ... The release of water treated through a filtration process called ALPS also stopped at the same time, it said.
一些您可能无法访问的结果已被隐去。
显示无法访问的结果