资讯
Gurgaon:MCG will construct a boundary wall and a drainage system at Bandhwari to prevent leachate from seeping out of the landfill. The estimated cost of the project is Rs 2.4 crore. "The boundary ...
Christine Cabets did not know what to expect when she boarded a yellow school bus for a tour of the Keystone Sanitary Landfill Saturday morning. As the tour unfolded, Cabets heard much about the ...
(MENAFN- IANS) Gurugram, April 2 (IANS) The Municipal Corporation of Gurugram (MCG) has prepared a plan to build a new drain to prevent the leachate seeping out from the Bandhwadi landfill site to ...
As the tour unfolded, Cabets heard much about the landfill’s liner system, leachate collection, stormwater drainage and monitoring system from Operations Manager Michael Bair, who fielded ...
The scope of the Rs3.37 billion project, Rehabilitation of Mehmood Booti Dumpsite, include stabilisation of waste in desired shape, development of Leachate treatment and landfill gas recovery ...
The project, which involves capping an exposed landfill and filling a degraded marsh to install a new drainage system ... "A modern landfill has a leachate collection system with wells where ...
一些您可能无法访问的结果已被隐去。
显示无法访问的结果