Among the restoration efforts, Autodesk played a pivotal role by contributing technology and expertise, providing its software, and creating detailed BIM models of the cathedral for reconstruction.
The type of project was CAD to BIM conversion, with the discipline being MEP Engineering. The model LOD required was 400. The scope of the work area included 28,000 sq. ft. and two floors.
一些您可能无法访问的结果已被隐去。
显示无法访问的结果